Waterproofing

Waterproofing of bathrooms

Stages of work:

  • preparation of concrete surfaces in bathrooms for the manufacture of rigidoelastic insulation

  • adhesion of the wall-floor joint and the manufacture of water-repellent corners (holkers) from Stigomal mortar
  • alignment of the walls at the height of one block of brick, patching the blades behind the water heater with Stigomal mortar
  • applying a multi-layer rigidelastic coating of Stigoelast on the lower ab plate in the bathrooms
  • processing the junction of icing and wall by applying Stigoflex in two layers

  • after the cement glaze is made, making a multi-layer coatingStigoelast as icing protection before ceramic paving setup

  • sealing all working joints and statements with permanently bald sealing mass       

Waterproofing

Waterproofing of underground buildings

Stages of work:

  • Preparation of the concrete surface for the manufacture of solidelastic waterproofing by removing cement milk with a high-pressure wasp or cement shortener mechanically

  • If necessary, carry out the installation of a retic sealing mass at the breaks of concreting of subject concrete

  • Applying multi-layered solidoelastic waterproofing Stigoelast to submissive concrete
  • After the constructed protective layer of concrete on horizontal insulation and the derived foundation plate, it is necessary to perform a holker of Stigomal mortar at the junction of the foundation plate and the subject concrete
  • When concreting ab walls, if necessary, carry out the installation of a shingous sealing mass at concreting breaks if the project does not provide for a rubber band
  • Tingling gap holes and horizontal and vertical working joints, applyingStigocryl impregnationand filling holes and shishlices with Stigomal mortar
  • Production of multi-layer rigidoelastic waterproofing Stigoelast on vertical surfaces of external ab walls
  • After vertical insulation performed in this way, it is desirable to carry out insulation protection with a stiroduro and plug foil before cluttering the construction pit 