Isolation

Insulation of water reservoirs

Stages of work:

  • preparation of the concrete surface of the walls, ceiling panel and floor of the water tank

  • protection and manufacture of holkers at the junction of ab wall and ab polymercement mortar plate with the addition of Stigomal

  • making multi-layer waterproofing of the inner surfaces of the walls, ceiling panel and floor by applying Stigolite

Websites stig.hr use so-called cookies 'cookies') so that the user can be provided with a service with full functionality and as high quality content as possible.

Skip to content