Recovery

Repair of concrete walls

Stages of work:

  • shaging damp and dilapidated plaster from concrete walls

  • cleaning and washing the substrate with a high-pressure wasp

  • patching up damage Stigomal mortar

  • applying multi-layer rigid insulation to the aligned vertical surface of the walls
  • plotting drilling schemes, drilling holes, installing dispensers
  • where necessary filling cavities, segragation or caverns inside the old concrete wall using the injection method
  • preparing the material and filling the dispenser by pouring Stigosil to saturation
  • removing the dispenser after treating the wall, sealing the holes with a Stigovez
  • final application of solid insulation Stigolit over the treated zone

Websites stig.hr use so-called cookies 'cookies') so that the user can be provided with a service with full functionality and as high quality content as possible.

Skip to content