Isolation

Stone walls

Stages of work:

  • shagging old, dilapidated and damp plaster, deepening joints, washing the entire surface

  • filling joints with polymercement mortar with the addition of Stigomala, alignment of the entire stone surface with Stigomal mortar

  • making multi-layer waterproofing on the aligned surface of the wall by applying Stigolite
  • protection and manufacture of corners (holkers) at the junction of wall-floor Stigomal mortar
  • interruption of the flow of capillary moisture above the S.K.G.I. terrain by method of pouring Stigosil
  • plastering the walls from the inside in a classic way (syringe, coarse and fine plaster)
  • plastering the walls from the outside (socle) with polymercement mortar with the addition of Stigomal